Saturday, July 30, 2011

Maumelle Classic morning preparations

It takes a couple of weeks of preparations to have the Course ready for a tournament like the Maumelle Classic. However, the morning preparations  during the actual tournament is some of the most important action!
We utilize every member of our crew, most of them on the greens.
Here are pictures of most of the jobs that we accomplish in front of the golfers.

We have 4 crew members walk mowing greens.

We have 1 crew member walk mowing collars. Here is a greens mower and the collar mower on 7 green.

Lorenzo on the bunker rake and Jose on the Triplex Greens mower completing the second mowing, he follows the walk mowers. 

Alfredo is on our greens roller this morning.

Cande and Oscar are both mowing fairways.

Today Mike had to drag in the clippings left by the fairway mowers.

Andy Changes the cups and paints them with the "Hole in White"


When everything is done on the greens We will use the Stimp meter to measure how fast they are rolling.
Today they were rolling nearly 12 feet.

No comments:

Post a Comment